

Announcement For Toyota (RUSH, AVANZA) Owners to Replace Fuel Pump
Campaign Summary
Abdul Latif Jameel Co. Ltd would like to inform owners of (RUSH, AVANZA Toyota models) of a Special Service Campaign on their vehicles to Replace Fuel Pump, there is a possibility that the fuel pump may stop operating, if this were to occur, warning lights and messages may be displayed on the instrument panel, and the engine may run rough. This can result in a vehicle stall, and the vehicle may be unable to be restarted. If loss of motive power occurs while driving at higher speeds, this could increase the risk of a crash
Vehicles involved in Saudi Market:
| Model | Model year | No. of vehicle |
|---|---|---|
| AVANZA | 2017-2020 | 1501 |
| RUSH | 2019-2020 | 2869 |
To check if your car is included in this campaign, kindly enter your vehicle’s Vin Number.
Frequently Asked Questions
What is the condition?
The subject vehicles are equipped with a fuel pump which may stop operating. If this were to occur, warning lights and messages may be displayed on the instrument panel, and the engine may run rough. This can result in a vehicle stall, and the vehicle may be unable to be restarted. If loss of motive power occurs while driving at higher speeds, this could increase the risk of a crash.
Which and how many vehicles are covered by this Special Service Campaign?
There are 4370 vehicles covered by this Special Service Campaign
What is ALJ going to do?
ALJ announce advising owners to make an appointment with his authorized Toyota dealer to replace fuel pump. The remedy will be performed at NO COST.
Are there any warnings that this condition exists?
Drivers may experience rough engine running, warning lights or message on the instrument panel, engine no start.
How long will the repair take?
To replace fuel pump will take approximately an hour and 30 minutes to 2 hours. It depends on the vehicles and the remedy. However, it may be necessary for the owner to make the vehicle available for a longer period of time depending upon the dealer’s schedule.